Arkell Driveway, May 2015

The Arkell driveway before replacing

A closeup of the dangerous driveway before replacing

Where driveway connected to the side walkway was a trip hazard

The sidewalk on the south side of the house sloped towards the house, allowing water to pool and seep into the crawl space under the house

Dangerous driveway is gone

Forms and steel waiting for the concrete pour

Sidewalk forms and steel waiting for the concrete pour

Stamping the driveway in progress

Driveway stamping with powder complete

Close-up of the driveway stamp with powder

 

 

Here is a video of what the driveway demolition looked like.

Here is a video of what the concrete pour looked like.